Cut a piece of 6 inch wide steel coil trim about 1 inch longer than the width of a siding board and place it behind the joint.
How to attach hardie panel siding.
Snap a line 1 in.
During my time working for james hardie i very rarely got calls from homeowners that wanted to submit a warranty claim for their hardie siding.
These strips installed at the bottom will make your first row of siding angle out to match the rest of the rows.
Manufactures and sells a range of exterior shingle siding board panel and trim products.
Thick and is available in 4x8 4x9 and 4x10 sizes.
Shears are available as a dedicated tool or as an attachment for a drill driver.
Textures include smooth stucco cedarmill and sierra 8.
Learn how to install hardiepanel vertical siding products.
Step 1 install the starter strip for the hardie board siding.
Create a drip edge find your most beat up pieces of siding and rip them down into 1 1 4 in.
Hardiepanel vertical siding is one of their key product lines and like other hardie materials it is constructed of cement and fiber for durability.
Hardie board installation will require joints between planks.
For a slow but virtually dustless way to cut siding use power shears.
Hardiepanel vertical siding is 5 16 in.
Hardie siding requires a minimum 2 gap from all hard surfaces like decks or rooflines and at least 8 from any soft surfaces like grass dirt or gravel.
Examples of these are shown below.
Apply caulk to the joint before and after installing the siding.
Re siding your house with hardiepanel vertical siding or combining it with hardieplank lap siding is sure to add visual punch to your design.
Please see your local james hardie.
Above the bottom of the wall sheathing as a guide.
Hardiepanel vertical siding is factory primed fiber cement vertical siding available in a variety of sizes and textures.
Join factory edges and place the cut edges against the corner trim boards.
Caulking joints are unnecessary but flashing behind the joints is required.
The thin starter strip is installed level with the roof of the building but installed at the foundation to serve as a guide to keep subsequent strips horizontally level.